Approval of Change Orders for Franklin Middle School |
|
|
Strategic Plans:
|
|
Enclosure:
|
|
File Attachment:
|
|
Summary:
|
|
Funding:
|
|
Resolution
|
The Superintendent recommends adoption of the following resolution: WHEREAS, the Board of Education has previously approved a Bid from below listed contractors for locations listed below; and WHEREAS, the Architect for such project has recommended approval of a change order which complies with the applicable provisions of Chapters 122 and 38 of the Illinois Revised Statutes; and WHEREAS, sufficient funds exist to provide payment for the additional requested change in this contract; NOW THEREFORE BE IT RESOLVED that the Board of Education approves the following Change Orders and directs the Superintendent to execute the necessary documents on behalf of the Board. Location: Franklin Middle School Change Order: #1 Amount: $19,113.71 Contractor: Johnco Construction Provide required steel lintels not shown on the drawings at doors and windows within the structure. Location: Franklin Middle School Change Order: #2 Amount: $11,661.86 Contractor: Johnco Construction Provide removal of existing heating coils not required by the new HVAC system. Location: Franklin Middle School Change Order: #3 Amount: $19,635.20 Contractor: Johnco Construction Provide additional roof tapered insulation to roofing system, not shown on the drawings. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
 |
Darrell Schaver - Director |
|
Signed By: |
|
Jennifer E. Gill - Superintendent |
|
|
|
|
|
Vote Results:
|
Original Motion | Member William Ringer Moved, Member Micah Miller seconded to approve the Original motion 'The Superintendent recommends adoption of the following resolution: WHEREAS, the Board of Education has previously approved a Bid from below listed contractors for locations listed below; and WHEREAS, the Architect for such project has recommended approval of a change order which complies with the applicable provisions of Chapters 122 and 38 of the Illinois Revised Statutes; and WHEREAS, sufficient funds exist to provide payment for the additional requested change in this contract; NOW THEREFORE BE IT RESOLVED that the Board of Education approves the following Change Orders and directs the Superintendent to execute the necessary documents on behalf of the Board. Location: Franklin Middle School Change Order: #1 Amount: $19,113.71 Contractor: Johnco Construction Provide required steel lintels not shown on the drawings at doors and windows within the structure. Location: Franklin Middle School Change Order: #2 Amount: $11,661.86 Contractor: Johnco Construction Provide removal of existing heating coils not required by the new HVAC system. Location: Franklin Middle School Change Order: #3 Amount: $19,635.20 Contractor: Johnco Construction Provide additional roof tapered insulation to roofing system, not shown on the drawings.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 7 Nay: 0. | The motion Carried 7 - 0 | | | Michael Zimmers | Yes | Anthony Mares | Yes | William Ringer | Yes | Micah Miller | Yes | Sarah Blissett | Yes | Buffy Lael-Wolf | Yes | Erica Austin | Yes | |
|
|
|
|
|
|