|
|
Meeting Date:
|
3/10/2025 - 6:30 PM
|
Category:
|
ROLL CALL ACTION ITEMS
|
Type:
|
Action
|
Subject:
|
Approval of Amendment to Life Safety Survey
|
Strategic Plans:
|
|
Enclosure
|
|
File Attachment:
|
|
Summary:
|
Health Life/Safety project for Lawrence Education Center estimated starting summer of 2025.
|
Funding:
|
Health Life/Safety Bond Fund
|
Resolution:
|
The Superintendent recommends adoption of the following resolution: BE IT RESOLVED that the Board of Education of Springfield School District #186, hereby accepts and approves the amended certified estimate from the Architect in the amount listed for building repairs at the school listed below. Lawrence Education Center $2,177,400.00 Remove and replace deteriorated domestic water piping, sanitary piping, toilet fixtures, and underground sanitary piping, including removal and replacement of concrete floors, chase walls, and toilet room exhausts in the toilet rooms and kitchen. Install a sprinkler system in all areas of the building. Provide new hot water supply piping. Replace temperature controls. Abate and replace floor tile in four small rooms. Replace fluorescent light fixtures with LED light fixtures to comply with current energy code.
|
Approvals:
|
Recommended By:
|
Signed By:
|
|
Mike Grossen - Director
|
|
Signed By:
|
|
Steve Miller - Director
|
|
Signed By:
|
|
Jennifer E. Gill - Superintendent
|
|
|
|
Vote Results:
|
Original Motion | Member Micah Miller Moved, Member Anthony Mares seconded to approve the Original motion 'The Superintendent recommends adoption of the following resolution: BE IT RESOLVED that the Board of Education of Springfield School District #186, hereby accepts and approves the amended certified estimate from the Architect in the amount listed for building repairs at the school listed below. Lawrence Education Center $2,177,400.00 Remove and replace deteriorated domestic water piping, sanitary piping, toilet fixtures, and underground sanitary piping, including removal and replacement of concrete floors, chase walls, and toilet room exhausts in the toilet rooms and kitchen. Install a sprinkler system in all areas of the building. Provide new hot water supply piping. Replace temperature controls. Abate and replace floor tile in four small rooms. Replace fluorescent light fixtures with LED light fixtures to comply with current energy code.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 7 Nay: 0. | The motion Carried 7 - 0 | | | Anthony Mares | Yes | Micah Miller | Yes | Sarah Blissett | Yes | Buffy Lael-Wolf | Yes | Erica Austin | Yes | Ken Gilmore | Yes | Debra Iams | Yes | |
|
|
|
|
|
|